Skip to content

Where is INPUT?

This page shows where to find input parameters in SIDRA INTERSECTION.

Download as Markdown


A

Actuated Signal Data

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


All-Red Time

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Apply HCM 6 Extended Roundabout Capacity Model

Site tab → Roundabouts dialog → Options → Section 5.6.1, 5.6.6


Apply Lane Blockage Model

Network tab → Network Data dialog → Section 6.4.1


Apply Merge Analysis

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Apply Platoon Dispersion

Network tab → Network Data dialog → Section 8.4


Apply Saturation Flow Estimation

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Approach Control

Site tab → Intersection dialog → Section 5.2.1


Approach Cruise Speed

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Approach Distance

Site tab → Intersection dialog → Section 5.2.1


Approach Movement

Site tab → Movement Definitions dialog → Approach Movements → Section 5.3.2


Approach Movement (Volume Store)

Site Volumes tab → Site Bin Setup dialog → Approach Movements → Section 14.2


Approach Name (Road Name)

Site tab → Intersection dialog → Section 5.2.1


Approach Travel Distance

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Area Type Factor

Site tab → Intersection dialog → Section 5.2.1


Arrival Type

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Arrivals During Green

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Arterial Segment

Site tab → Site Setup tab - Add New Site group dialog → Section 5.1


Average Income

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


B

Basic Saturation Flow

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Bicycles

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Bin ID, Bin Name, Bin Title (Volume Store)

Site Volumes tab → Site Bin Setup dialog → Bin Data → Section 14.2


Blockage Tolerance

Site tab → Parameter Settings dialog → Model Parameters → Section 5.5.2


Bring to Front

Network tab → Modify Network dialog → Section 6.2


Buses

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Buses Stopping

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


C

Calibration Notes

Site tab → Parameter Settings dialog → Options → Section 5.14.1


Calibration Parameter (Downstream Short Lane)

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Capacity Adjustment

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Category Setup

Tools tab → (For Category definitions) dialog → Section 11.4


CCG Phasing & Timing

Network tab → 6.5.2 dialog


Circulating Width

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


Clearance 1 Time

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Clearance 2 Time (previously: Clearance Time Overlap)

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


CO2 to Fuel Consumption Rate

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Common Control Group (CCG) ID

Network tab → Define CCGs dialog → Section 6.5.1


Common Control Group (CCG) Name

Network tab → Define CCGs dialog → Section 6.5.1


Conflict Zone Length

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Connect To (Strip Island)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Connected and Automated Vehicles (CAVs)

Section 2.6.2, 5.11.3, 5.14.2


Connected Site / CCG

Network tab → Network Timing dialog → Coordination → Section 6.6.1


Continuous Lane Capacity (Merge Analysis)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Coordinated Site / CCG

Network tab → Network Timing dialog → Coordination → Section 6.6.1


Coordinates

Maps tab → Set Site Coordinates dialog → Section SIDRA MAPS User Guide, A1


Cost Parameters

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Cost Unit

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3

Network tab → Network Data dialog → Override Site Data → Section 6.4.1


Critical Gap

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Critical Gap (Merge Analysis)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Critical Gap (Turn On Red)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Critical Gap (Zebra Crossing Pedestrians Opposing)

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Crossing Distance

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Crossing Speed

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Cycle Rounding

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → Network Timing dialog → Timing Options → Section 6.6.3

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Cycle Time Option

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


D

Define CCGs

Network tab → 6.5.1 dialog


Delay and Queue

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Delay Model Parameter (Uninterrupted Flow)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Departure Headway (AWSC)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Design Life Analysis

Network tab → Network Demand & Sensitivity dialog → Section 6.7

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1


Design Life Analysis Objective

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Desired Speed

Network tab → Network Data dialog → Section 6.4.1

Network tab → Route Data dialog → Section 7.1.1

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Detection Data

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Diagonal Crossing

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Distance for Full Utilisation (Downstream Short Lane)

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Downstream Distance

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Downstream Short Lane Model

Site tab → Parameter Settings dialog → Advanced → Section 5.14.5


Drag Parameter, A

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Drag Parameter, B

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Dual-Ring (Two-Ring) Phasing

See Variable Phasing Analysis topic tab → 5.12.1 dialog


Dummy Movement Data (Dummy Movement Exists, Minimum Green Time, Maximum Green Time)

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


E

Early Cut-Off

Site tab → Phasing & Timing dialog → Movement Data → Section 5.12.5


Edit IDs

Tools tab → Tools tab ribbon - Unique IDs group dialog → Section 11.6


Effective Detection Zone Length

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Efficiency Parameter, beta

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


End Departures

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


End Departures (Turn On Red)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


End Gain

Site tab → Pedestrians dialog → Pedestrian Timing data → Section 5.7.3

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Entry Angle

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


Entry Radius

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


Entry/Circ Flow Adjustment

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.4


Environment Factor

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.4


Exclude Geometric Delay

Network tab → Network Data dialog → Override Site Data → Section 6.4.2

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2

Site tab → Roundabouts dialog → Options → Section 5.6.1


Exclude Slip/Bypass Lane from Signal Analysis

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Exclude U-Turn Before Intersection from Signal Analysis

Site tab → Movement Definitions dialog → Approach Movements → Section 5.3.2


Exit Cruise Speed

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Exit Distance

Site tab → Intersection dialog → Section 5.2.1


Exiting Flow Effect

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Exiting Flow Effect (Turn On Red)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Extra Bunching (Site Analysis)

Site tab → Intersection dialog → Intersection → Section 5.2.1, 8.1.9, 8.1.16


Extra Bunching (Network Analysis)

Site tab → Intersection dialog → Intersection → Section 5.2.1, 8.1.9, 8.1.16


Extra Midblock Delay

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


F

Flow Scale (Constant)

Site tab → Volumes dialog → Vehicle Volume Factors → Section 5.8.2

Site tab → Volumes dialog → Pedestrian Volumes → Section 5.8.3


Flow Scale (Constant) (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volume Factors → Section 14.2.2

Site Volumes tab → Volumes (Bin) dialog → Pedestrian Volumes → Section 14.2.2


Flow Scale - Lower Limit

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Flow Scale - Upper Limit

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Flow Scale Analysis

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Flow Scale Analysis Objective

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Follow-up Headway

Site tab → Gap Acceptance dialog → Gap Acceptance Data/Settings → Section 5.10.1


Follow-up Headway (Merge Analysis)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Follow-up Headway (Turn On Red)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Follow-up Headway (Zebra Crossing Pedestrians Opposing)

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Free Queue Distance

Site tab → Lane Geometry dialog → Lane Discipline → Section 5.4.2


Freeway

Site tab → Site Setup tab - Add New Site group dialog → Section TBI


Freeway Basic Segment

Site tab → Site Setup tab - Add New Site group dialog → Section TBI


Freeway Segment with Ramps (Two-Way, One-Way)

Site tab → Site Setup tab - Add New Site group dialog → Section TBI


Fuel & Emission Model Parameters

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Fuel Resource Cost Factor

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Full Crossing (Main Crossing)

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


G

Gap Acceptance Capacity Model

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Gap Acceptance Factor

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Gap Acceptance Factor (Merge Analysis)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Gap Setting (Actuated Signal Data)

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Grade

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Green Split Priority

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4, 8.1.11

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Growth Model (Design Life)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Growth Rate (per year)

Site tab → Volumes dialog → Vehicle Volumes Factors → Section 5.8.2

Site tab → Volumes dialog → Pedestrian Volumes → Section 5.8.3


Growth Rate (per year) (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14.2.2

Site Volumes tab → Volumes (Bin) dialog → Pedestrian Volumes → Section 14.2.2


H

HCM 6 Extended Roundabout Capacity Model Parameters

Site tab → Roundabouts dialog → HCM 6 Extended Data → Section 5.6.6


HCM 6 Roundabout Model Data

Site tab → Roundabouts dialog → HCM 6 Data → Section 5.6.5


HCM Delay Formula

Network tab → Network Data dialog → Override Site Data → Section 6.4.2

Site tab → Roundabouts dialog → Options → Section 5.6.1

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


HCM Queue Formula

Network tab → Network Data dialog → Override Site Data → Section 6.4.2

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


HCM Roundabout Capacity Model Extension

Site tab → Roundabouts dialog → Options → Section 5.6.1


Heavy Vehicles

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


High Priority for Green Splits

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Hours per Year

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Hours per Year (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14.2.2


I

Idling Rate

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Import Gap Acceptance Data

Site tab → Gap Acceptance dialog → Section 5.10


Import Initial Demand

Site tab → Site Geometry dialog → Lane Data → Section 5.4.3

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Import Movement Data (various)

Site tab → Vehicle Movement Data dialog → Section 5.11


Import Parameter Settings (various)

Site tab → Parameter Settings dialog → Section 5.14


Import Scenarios

Site tab → Site Scenarios dialog → Section 15


Import Sequence

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1


Import Site Setup

Bin tab → Site Bin Setup dialog → Section 14.2.1


Import Volume Data

Bin tab → Volumes (Bin) dialog → Section 14.2.2

Site tab → Volumes dialog → Section 5.8


Include Cost for Pedestrians

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Include Lane Blockage effects in determining Phase Times

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Include Short Lane Upstream Delay & Stops

Site tab → Lane Geometry dialog → Lane Data → Section 5.14.5, 8.1.3


Include Short Lanes in determining Queue Storage Ratio

Site tab → Parameter Settings dialog → Options → Section 5.14.1

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Include the Reverse Route (Time-Distance Display Option)

Network tab → Route Data dialog → Route Settings → Section 7.1.2


Initial Queued Demand

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3, 8.1.20


Inscribed Diameter

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


Interactive Offsets

Route tab → 7.2 dialog


Island Diameter

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


L

Lane Blockage Calibration Factor

Site tab → Lane Movements dialog → Blockage calibration → Section 5.5.2


Lane Colour (Layout)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Configuration

Site tab → Lane Geometry dialog → Section 5.4.1


Lane Control

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Disciplines

Site tab → Lane Geometry dialog → Section 5.4.2


Lane ID

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Length

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Movement Flow Proportions

Site tab → Lane Movements dialog → Flow Proportions → Section 5.5.1


Lane Type

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Utilisation Ratio

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Lane Width (Entry)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Lane Width (Upstream)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Large Trucks

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Late Start

Site tab → Phasing & Timing dialog → Movement Data → Section 5.12.5


Left-In Left-Out Templates

In Sign Control Template group tab → 2.3, 5.10.6 dialog


Leg Geometry

Site tab → Intersection dialog → Section 5.2.1


Leg Geometry (Volume Store)

Site Volumes tab → Site Bin Setup dialog → Leg Geometry → Section 14.2.1


Light Rail / Trams

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Light Vehicles

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Lower Limit of Speed Efficiency for TTI

Network tab → Network Data dialog → Section 6.4.1

Network tab → Route Data dialog → Section 7.1.1

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


M

Main Crossing

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Main Route Direction

Network tab → Route Data dialog → Route Settings → Section 7.1.2


Mass

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Maximum Cycle Time

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Maximum Green

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Maximum Green Time (Actuated Signal data)

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Maximum Number of Iterations

Network tab → Network Data dialog → Section 6.4.1


Maximum Power

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Merge Analysis Parameters

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Merge from Left / Right Templates

In Sign Control Template group tab → 2.3, 5.10.6 dialog


Merge Lane Number (Merge Analysis)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Merge Lane Number (Short Lane Data)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Merge Networks

Network tab → Network Setup tab - Networks Setup group dialog → Section TBI


Merge Type

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Mini Roundabout

See Mini Roundabouts topic tab → 5.6.3 dialog


Minimum Clearance Time

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Minimum Departures

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.4.1


Minimum Departures (Merge Analysis)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Minimum Departures (Zebra Crossing Pedestrians Opposing)

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Minimum Downstream Distance (Downstream Short Lane)

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Minimum Downstream Utilisation Ratio (Downstream Short Lane)

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Minimum Green

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Minimum Pedestrian Time (Pedestrian Minimum Time)

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Minimum Phase Time

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Minimum Walk Time

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Minor Phase Actuation

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Movement Classes

Site tab → Movement Definitions dialog → Section 5.3.1


Movement Classes (Volume Store)

Site Volumes tab → Site Bin Setup dialog → Movement Classes → Section 14.2.1


Movement Exists

Site tab → Movement Definitions dialog → Approach Movements → Section 5.5.2


Movement ID

Site tab → Movement Definitions dialog → Approach Movements → Section 5.3.2


Movement ID (Pedestrian)

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.1


Movement ID (Vehicle)

Site tab → Movement Definitions dialog → Approach Movements → Section 5.3.2


N

Negotiation Distance

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Negotiation Radius

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Negotiation Speed

Site tab → Vehicle Movement Data dialog → Path Data → Section 5.11.1


Network Analysis Settings

Network tab → Network Data dialog → Section 6.4.1


Network Category

Network tab → Network Data dialog → Section 6.4.1


Network Configuration (Modify Network)

Network tab → Network Configuration dialog → Section 6.2


Network Cycle Time

Network tab → Network Timing dialog → Timing Options → Section 6.6.1


Network ID

Network tab → Network Data dialog → Section 6.4.1


Network Information

Network tab → Network Data dialog → Properties → Section 6.4.2


Network Level of Service Method

Network tab → Network Data dialog → Section 6.4.1


Network Level of Service Target

Network tab → Network Data dialog → Section 6.4.1


Network Name

Network tab → Modify Network dialog → Section 6.2

Network tab → Network Data dialog → Section 6.4.1


Network Output by Routes Options

Network tab → Network Data dialog → Network Routes → Section 6.4.3


Network Properties

Network tab → Network Data dialog → Properties → Section 6.4.2


Network Scenarios

Network tab → 15 dialog


Network Templates

Network tab → Network Setup ribbon - Network Setup group dialog → Section 2.3


Network Title

Network tab → Network Data dialog → Section 6.4.1


Number of Circulating Lanes

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3


Number of Years (Design Life)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


O

Occupancy (Vehicle Occupancy (pers/veh))

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


OD Movement

See Approach Movement tab → 5.3.2 dialog


Opposing Pedestrian Factor

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Opposing Peds (Signals)

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Opposing Vehicle Factor

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Opposing Vehicle Factor (Merge Analysis)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Optimum Cycle Time (Cycle Time Option)

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2

Network tab → Network Timing dialog → Timing Options → Section 6.6.3


Optimum Maximum Green Settings (Cycle Time Option)

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Option for Main Crossing Volume Data

Site tab → Volumes dialog → Pedestrian Volumes → Section 5.8.3


Origin - Destination Movement

See Approach Movement tab → 5.3.2 dialog


Other Roundabout Models (FHWA, HCM 2000, NAASRA 1986)

Site tab → Roundabouts dialog → Options → Section 5.6.1


Overflow Lane Number (Approach Short Lane)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


P

Parking Manoeuvres

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Passage Time

See Gap Setting tab → 5.12.3, 6.5.2 dialog


Passenger Car Equivalents

Site tab → Parameter Settings dialog → Model Parameters → Section 5.14.2


Peak Flow (Analysis) Period

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Peak Flow (Analysis) Period (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14.2.2


Peak Flow Factor

Site tab → Volumes dialog → Pedestrian Volumes → Section 5.8.3

Site tab → Volumes dialog → Vehicle Volumes Factors → Section 5.8.2


Peak Flow Factor (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14.2.2

Site Volumes tab → Volumes (Bin) dialog → Pedestrian Volumes → Section 14.2.2


Pedestrian Actuation

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Pedestrian Average Income

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Pedestrian Cost Parameters

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Pedestrian End Gain

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Pedestrian Level of Service Target

Site tab → Parameter Settings dialog → Options → Section 5.14.1


Pedestrian Maximum Time

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Pedestrian Minimum Time

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Pedestrian Movement Data

Site tab → Pedestrians dialog → Section 5.7.2


Pedestrian Movements

Site tab → Pedestrians dialog → Section 5.7.1


Pedestrian Start Loss

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Pedestrian Time Value Factor

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Pedestrian Timing Data

Site tab → Pedestrians dialog → Section 5.7.3


Pedestrian Volumes

Site tab → Volumes dialog → Section 5.8.3


Pedestrians

Site tab → Site Setup ribbon - Add New Site group dialog → Section 5.7


Percent Opposed by Nearest Lane Only

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.1


Percent Opposed by Nearest Lane Only (Turn On Red)

Site tab → Gap Acceptance dialog → Gap Acceptance Data → Section 5.10.3


Percent Opposing in Merge Lane (Zipper Merge)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Percent Opposing in Short Lane (Zipper Merge)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Percentage Stopping Condition

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Percentile Queue (see: Queue in Output)

Site tab → Parameter Settings dialog → Options → Section 5.14.1

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Performance Index

Site tab → Parameter Settings dialog → Options → Section 5.14.1

Network tab → Network Data dialog → Section 6.4.1


Performance Measure

Site tab → Parameter Settings dialog → Options → Section 5.14.1

Network tab → Network Data dialog → Section 6.4.1


Phase Actuation (Minor Phase Actuation)

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Phase Editor

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Phase Frequency

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Phase Name

Site tab → Phasing & Timing dialog → Sequence Editor → Section 5.12.2

Network tab → CCG Phasing & Timing dialog → Sequence Editor → Section 6.5.2


Phase Selector

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Phase Time (optional)

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Phase Time Options

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Phase Transition

Site tab → Phasing & Timing dialog → Movement Data → Section 5.12.5

Network tab → CCG Phasing & Timing dialog → Movement Data → Section 6.5.2


Platoon Dispersion Model

Site tab → Parameter Settings dialog → Advanced → Section 5.14.5


Practical Cycle Time (Cycle Time Option)

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → Network Timing dialog → Timing Options → Section 6.6.3

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


Practical Degree of Saturation

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Priorities

Site tab → NA dialog → Section 5.9


Properties (Network Attributes)

Network tab → Network Data dialog → Properties → Section 6.4.2


Properties (Site Attributes)

Site tab → Intersection dialog → Properties → Section 5.2.2


Pump Price of Fuel

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Q

Queue Detector Setback Distance

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Queue in Output (previously: Percentile Queue)

Network tab → Network Data dialog → Override Site Data → Section 6.4.2

Site tab → Parameter Settings dialog → Options → Section 5.14.1


Queue Space

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


R

Ratio of Running Cost to Fuel Cost

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Red-Arrow Drop Off

Network tab → CCG Phasing & Timing dialog → Movement Data → Section 6.5.2

Site tab → Phasing & Timing dialog → Movement Data → Section 5.12.5


Reference Phase

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Results For (Design Life / Flow Scale / Sensitivity)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1, 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Right-In Right-Out Templates

In Sign Control Template group tab → 2.3, 5.10.6 dialog


Road Name (Approach Name)

Site tab → Intersection dialog → Section 5.2.1


Roundabout

Site tab → Site Setup tab - Add New Site group dialog → Section 5.6


Roundabout Data

Site tab → Roundabouts dialog → (Multiple tabs) → Section 5.6


Roundabout LOS Method

Site tab → Roundabouts dialog → Options → Section 5.6.1


Roundabout Metering Settings

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Roundabout Model Options

Site tab → Roundabouts dialog → Options → Section 5.6.1


Route Configuration (Modify Route)

Network tab → Route Configuration dialog → Section 7.2


Route ID

Network tab → Route Data dialog → Section 7.1.1


Route Level of Service Method

Network tab → Route Data dialog → Section 7.1.1


Route Name

Network tab → Route Data dialog → Section 7.1.1


Route Output Option

Network tab → Route Data dialog → Route Settings → Section 7.1.2


Route Title

Network tab → Route Data dialog → Section 7.1.1


Routes for Offset Calculation

Network tab → Network Timing dialog → Signal Offsets → Section 6.6.2


S

Saturation Flow Rate (Pedestrians)

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Saturation Flow Rate (Vehicles) [Basic Saturation Flow]

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Saturation Speed

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Scale Factor - Lower Limit (Flow Scale / Sensitivity)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1, 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Scale Factor - Upper Limit (Flow Scale / Sensitivity)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1, 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Scale Factor Increment (Sensitivity)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Scenario ID, Scenario Name

Site tab → Site Scenarios dialog → Section 15.1

Network tab → Network Scenarios dialog → Definitions → Section 15.1


Segment ID

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Segment Length

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Select Routes

Network tab → Network Data dialog → Network Routes → Section 6.4.3


Selected Sequence (For Editing)

Network tab → CCG Phasing & Timing dialog → Sequences → Section 6.5.2

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1


Send to Back

Network tab → Modify Network dialog → Section 6.2


Sensitivity Analysis

Site tab → Site Demand & Sensitivity dialog → Section 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Sequence Name

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1

Network tab → CCG Phasing & Timing dialog → Sequences → Section 6.5.2


Sequences

Site tab → Phasing & Timing dialog → Section 5.12.1

Network tab → CCG Phasing & Timing dialog → Section 6.5.2


Short Lane Capacity (Calibration Options)

Site tab → Lane Geometry dialog → Lane Data → Section 5.4.3


Short Lane Colour (Layout)

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Short Lane ID

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Short Lane Length

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Short Strip Island

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Show Secondary Platoons (Time-Distance Display Option)

Network tab → Route Data dialog → Route Settings → Section 7.1.2


Sign Control

Site tab → Site Setup tab - Add New Site group dialog → Section 5.1


Signal Analysis Method

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1

Network tab → CCG Phasing & Timing dialog → Sequences → Section 6.5.2


Signal Coordination

Network tab → Network Timing dialog → Coordination → Section 6.6.1

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Signal Offset Definitions

Network tab → Network Timing dialog → Signal Offsets → Section 6.6.2


Signal Offsets

Network tab → Network Timing dialog → Section 6.6.2


Signalised Slip/Bypass Lane Crossing

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Signals

Site tab → Site Setup tab - Add New Site group dialog → Section 5.1


Site / CCG Phase Times (Cycle Time Options)

Network tab → Network Timing dialog → Timing Options → Section 6.6.3


Site Bin Setup

Volume Store tab → Site Volumes tab - Project Pane - SITE BIN INPUT dialog → Section 14.2.1


Site Category

Site tab → Intersection dialog → Section 5.2.1


Site ID

Site tab → Intersection dialog → Section 5.2.1


Site Information

Site tab → Intersection dialog → Properties → Section 5.2.2


Site Level of Service Method

Site tab → Parameter Settings dialog → Options → Section 5.14.1

Network tab → Network Data dialog → Override Site Data → Section 6.4.2


Site Level of Service Target

Site tab → Parameter Settings dialog → Options → Section 5.14.1


Site Name

Site tab → Intersection dialog → Section 5.2.1


Site Properties

Site tab → Intersection dialog → Properties → Section 5.2.2


Site Scenarios

Site tab → 5.8, 15 dialog


Site Templates

Site tab → Site Setup ribbon - Add New Site group dialog → Section 2.3


Site Title

Site tab → Intersection dialog → Section 5.2.1


Slip/Bypass Lane Control

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Slip/Bypass Lane Crossing

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Slip/Bypass Lane Width

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Staged Crossing (Main Crossing)

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Staged Crossings at Unsignalised Intersections

See "Two-Stage Crossings" in Site Templates and Network Templates. tab → 2.3, 5.10.6, 9.4.3, 9.4.5 dialog


Standard Class

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


Start Loss

Site tab → Pedestrians dialog → Pedestrian Timing data → Section 5.7.3

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Stop Line Setback Distance

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10


Stopline Travel Time

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Strip Island Fill Style

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


T

Time Value Factor

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Time-Distance Display Options

Network tab → Route Data dialog → Route Settings → Section 7.1.2


Traffic Signal Data

Site tab → Phasing & Timing dialog → (Multiple tabs) → Section 5.12

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3

Network tab → CCG Phasing & Timing dialog → (Multiple tabs) → Section 6.5.2

Network tab → Network Timing dialog → (Multiple tabs) → Section 6.6

Route tab → Route Settings dialog → Section 7.1.2

Route tab → Interactive Offsets dialog → Section 7.2


Turbo Island

Site tab → Roundabouts dialog → Roundabout Data → Section 5.6.3, 5.6.9


Turbo Roundabout

Site tab → Site Setup tab - Add New Site group dialog → Section 5.6.3, 5.6.9


Turn On Red

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Turn On Red (Gap Acceptance Data)

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3


Turn Radius

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Turning Vehicle Effect

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Turning Vehicle Factor

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Two-Stage Crossings at Unsignalised Intersections

In Site Templates and Network Templates. tab → 2.3, 5.10.6, 9.4.3, 9.4.5 dialog


U

U-Turn Before Intersection

Site tab → Movement Definitions dialog → Approach Movements → Section 5.3.2


Undetected Movement

Site tab → Phasing & Timing dialog → Movement Data → Section 5.12.5

Network tab → CCG Phasing & Timing dialog → Movement Data → Section 6.5.2


Unit Extension

See Gap Setting tab → 5.12.3, 6.5.2 dialog


Unit Time for Volumes

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1


Unit Time for Volumes (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14


Unsignalised (Zebra) Slip/Bypass Lane Crossing

Site tab → Pedestrians dialog → Pedestrian Movements → Section 5.7.1


Use Constant Number of Years

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Use Constant Scale Factor (Flow Scale / Sensitivity)

Site tab → Site Demand & Sensitivity dialog → Section 5.13.1, 5.13.2

Network tab → Network Demand & Sensitivity dialog → Section 6.7


Use for Pedestrian Staging

Site tab → Lane Geometry dialog → Lane Configuration → Section 5.4.1


Use Multi-Sequence Analysis

Network tab → CCG Phasing & Timing dialog → Sequences → Section 6.5.3

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1


User Class

Site tab → Movement Definitions dialog → Movement Classes → Section 5.3.1


User Offset

Network tab → Network Timing dialog → Coordination → Section 6.6.1


User Speed Efficiency - Level of Service Method

Network tab → Network Data dialog → Settings → Section 6.4.2


User-Given Cycle Time (Cycle Time Option)

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2

Network tab → Network Timing dialog → Timing Options → Section 6.6.3


User-Given Phase Times (Cycle Time Option)

Site tab → Phasing & Timing dialog → Timing Options → Section 5.12.4

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Timing Options → Section 6.5.2


V

Variable Phase

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Variable Phasing Analysis

Site tab → Phasing & Timing dialog → Sequences → Section 5.12.1

Network tab → Phasing & Timing dialog → Sequences → Section 6.5.2


Vehicle Cost Method

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Vehicle Cost Parameters

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Vehicle Length

Site tab → Vehicle Movement Data dialog → Calibration → Section 5.11.2


Vehicle Mass

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Vehicle Maximum Power

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Vehicle Movement Timing Data

Site tab → Vehicle Movement Data dialog → Signals → Section 5.11.3


Vehicle Occupancy (pers/veh)

Site tab → Volumes dialog → Vehicle Volume Factors → Section 5.8.2


Vehicle Occupancy (pers/veh) (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volume Factors → Section 14


Vehicle Operating Cost

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Vehicle Parameters (Fuel & Emissions)

Site tab → Parameter Settings dialog → Fuel & Emissions → Section 5.14.4


Vehicle Time Cost

Site tab → Parameter Settings dialog → Efficiency & Cost → Section 5.14.3


Vehicle Volume Factors

Site tab → Volumes dialog → Section 5.8.2


Vehicle Volumes

Site tab → Volumes dialog → Section 5.8.1


Volume Data Method (Vehicles)

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1


Volume Data Method (Vehicles) (Volume Store)

Site Volumes tab → Volumes (Bin) dialog → Vehicle Volumes → Section 14


Volume Data Settings for Site

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1


Volumes

Site tab → Site Project Pane - SITE INPUT dialog → Section 5.8


Volumes (Bin)

Volume Store tab → Site Volumes tab - Project Pane - SITE BIN INPUT dialog → Section 14


Volumes (Pedestrians)

Site tab → Volumes dialog → Pedestrian Volumes → Section 5.8.3


Volumes (Vehicles)

Site tab → Volumes dialog → Vehicle Volumes → Section 5.8.1


W

Walk Time Extension

Site tab → Pedestrians dialog → Pedestrian Timing Data → Section 5.7.3


Walking Speed (Average)

Site tab → Pedestrians dialog → Pedestrian Movement Data → Section 5.7.2


Y

Yellow Time

Site tab → Phasing & Timing dialog → Phase & Sequence Data → Section 5.12.3

Site tab → Roundabouts dialog → Roundabout Metering → Section 5.6.10

Network tab → CCG Phasing & Timing dialog → Phase & Sequence Data → Section 6.5.2


Z

Zebra Crossing Analysis Parameters

Site tab → Gap Acceptance dialog → Settings → Section 5.10.3